50,000 transmission housings/year re-sourced from China to a vetted Indian foundry. 6-month parallel-production validation. Zero missed shipments since SOP.
Dedicated CNC line established with full tooling investment recovered in 8 months. Programme handles 240,000 units/year with zero missed shipments.
Sheet metal enclosures, sub-assemblies, and packaging consolidated. Single PO, single shipment, single accountable contact. 22% cost saving.
FDA-grade injection molded and CNC parts with full DHR documentation and lot traceability. ISO 13485 certified suppliers maintained from day one.
Dedicated aluminum die casting for cordless drill gear housings — 240k units/year across 3 SKUs. Tooling investment recovered in 9 months vs forecast 14 months.
4,000 IRS-spec couplings/year, switching from Chinese supplier with quality issues. Two Pune-based forging suppliers qualified, 6-month parallel production.